The First Flush Diverter is designed to trap the leaves and debris from roofs & gutters When full the diverter is automatically closed and clean water is diverted into the storage tank
Horizontal PE exterior-ribbed tanks designed for below-ground burial for stormwater retention or detention applications Tanks include access riser for entry if required